Inspection · Sharjahالفحص · الشارقةCERTIS Services

Amusement ride inspection in Sharjahفحص الألعاب الترفيهية في الشارقة

Your family entertainment centre opens inside a Sharjah mall in a few weeks. The fit-out is nearly done, the date is already public, and someone has just asked for a third party amusement ride inspection report you do not have. It may be the mall’s operations team, an insurer, an event organiser or the authority that holds your approval. What you want now is simple: to know what stands between these machines and opening day while there is still time to act, from someone with no stake in the answer.

An examiner who is not protecting your date

That is the whole value of a third party. The supplier wants the sale closed and your team wants the schedule kept. Both are normal, and both are why their paperwork does not end the conversation. An independent examination gives you findings that do not depend on either.

Certis is accredited by EIAC, the Emirates International Accreditation Centre, and works to the inspection-body requirements of ISO/IEC 17020. Certis is also an IAAPA member. Our headquarters and main engineering team are in Dubai Investment Park, covering Dubai, Abu Dhabi, Sharjah and the northern emirates.

Four kinds of site, four different problems

A family entertainment centre inside a mall

Indoor rides look protected: no sun, no sand, no wind. The pressure comes from elsewhere. You may have bought new machines on a tight fit-out, or taken over a unit with equipment the last tenant left behind. In that second case the first question is whether anyone can still produce the design file and the maintenance history. Where they are missing we tell you early, and we tell you what can stand in for them: a re-established load case, a structural assessment or an NDT campaign. That route costs more and takes longer than a complete file, so you want to hear about it now.

An indoor play area with no machinery at all

It is easy to assume soft play needs no examiner. It has no drive and no ride cycle, but it has the youngest guests in the building. Under EN 1176, the questions are free height of fall and impact areas, entrapment, structural loading, and a capacity your staff can actually supervise. If the layout is still on paper, this is the moment to call: a design review finding costs a redraw, and the same finding at site acceptance costs a rebuild and an opening date. Our field note on EN 1176 and soft play sets out the path.

A temporary attraction or fairground device for a season

Sharjah’s summer promotions campaign shows the format: in 2026 it included a family entertainment venue open for a few weeks. On any temporary site, you want documentation reviewed while equipment is still in transit, each device verified in stages as it becomes available, and weather limits written down and given to a named role before the first queue forms.

An outdoor family park with ageing equipment

Open-air rides take the Gulf directly: heat on exposed steel, UV on polymers and restraints, airborne sand in bearings and tracks, and humidity on Sharjah’s coastal sites. An interval lifted straight out of a European manual tells you very little about that. We set intervals from the device, its duty cycle and its environment.

From your first message to the report

  • You send what you have — The device list, manufacturer and year, the last report, the design file if it exists, and your date. A gap in that list is useful information, not a reason to wait.
  • We define the scope — Which devices, and which moment in their life. We tell you the timeline at scoping, based on the number of devices and the state of the file, rather than quoting a number here that would be wrong for your site.
  • The ride is examined as a system — Structure, mechanics and hydraulics, control and functional safety, restraints and passenger containment are read together, because a finding in one changes how the other three are read.
  • You receive findings you can act on — What was looked at, what was found, what the clause asks for and what closing the gap takes. Where the device qualifies, a certificate; where it does not, the shortest compliant path to it.

Which standard applies depends on the device. For rides, the examination is to EN 13814, ISO 17842 and ASTM F24; the wider list is below.

What we can show you

Here are two formats you may recognise, both elsewhere in the UAE. For attractions inside malls, independent examination for Emaar Entertainment includes Storm Coaster at Dubai Hills Mall and Play DXB at Dubai Mall. For a seasonal event, Certis coordinated technical assurance across the Sheikh Zayed Festival in Abu Dhabi, supporting safe delivery of rides, attractions and live entertainment throughout the season. The rest is on our case studies page.

Certis in the field
100+Locations
120+Standards we examine to
1000+Inspections performed

Standards referenced

EN 13814ISO 17842ASTM F24ASTM F2291EN 1176EN 14960EN 12572EN 15567EN 1069

Questions operators ask us

Do you have an office in Sharjah?

Our headquarters and main engineering team are in Dubai Investment Park, not in Sharjah, and they cover Dubai, Abu Dhabi, Sharjah and the northern emirates. Our engineers travel to your site for the examination itself. Tell us where it is and your date, and you get a first technical answer within one business day.

Will your report get my Sharjah venue approved?

The decision belongs to whoever grants your approval, so we do not promise it. What we can do is start from what they asked for: send us the exact wording of the request you received, and the scope starts there.

Can you look at rides that are already installed or already open?

Yes, and that is where most engagements begin. We start from what exists on your site, then set out the shortest compliant path from there.

Tell us what you are opening, and when